Jan 1st, 2012 At Technical Designs, 3D is synonymous with BIM (Building Information Modeling). BIM is not a CAD software program; it is an entirely new way of looking at the design and construction of a building.
Silverland

(Move your mouse over the above image to see the 3D coordination at work.)

 
As an Owner why should I care about BIM / 3D design?

Technical Designs approaches the market to meet our clients expectations in the following ways:

  • Be knowledgeable and proficient in Building Systems and in particular the Types of Systems that would best serve our Client’s business.
  • To bring the latest tools and technologies; this improves our internal productivity to reduce our cost to the Client, but also to extend our efforts out into our Client’s business.
  • Once we understand our Client’s business, we take what we do and offer ways to create a marketable differentiation to advance our Client’s mission.
  • To be adept at working with our Clients from project conception to project management. We spent less time focusing on what the construction industry is selling and more on the Client's end vision.
  • We have proven from our own experience that BIM has led to a tighter design package with less field coordination and change orders.Technical Designs adopted a top/down mission to become proficient in 3D BIM design at all levels of the organization. This is the common canvas that everyone shares and we have built upon this to create a solution that benefits the Owner from the day of project inception through the management of the facility.

    Benefits of BIM
     
    "The real promise of BIM lies in its application across the entire project team, especially in the area of improved building performance."

    —Jerry Laiserin, Technology Industry Analyst

    When Jerry discusses Performance, we believe it is not only the construction process but how the final product performs in terms of energy, comfort, and serviceabilitiy.


    IPD brings it all together...
    BIM

    We knew from experience that no matter how competent and careful we approached the design process, we found that the coordination of the structure and the mechanical systems in particular using 2D drawings always led to unexpected conflicts. We invested in Autodesk Revit as our 3D BIM tool and no part of the design process has benefited more than a 3D design analysis of the structural / mechanical interface.

    Read more on BIM

    IPD

    IPD

    Technical Designs became interested early on in the use of Integrated Project Delivery (IPD) . IPD is simply the use of web based tools that support consultants with specific expertise to collaborate on a single design model that exists in the cloud where team members have direct access in real time. This process could be applied to any type of project: from designing a circuit board to movie production. Technical Designs focused on what knowledge we bring to the process and developed the tools and skills necessary to support the building design process within the construction industry.

    The IPD Gateway

    Tools to integrate LEED – Clients that want to design in 3D, use LEED strategies, merge building software controls, and manage their project with cloud tools will find Technical Designs has developed a proprietary method to bring Integrated Project Delivery to the next logical step. New construction and existing buildings have been considered in this tool’s development.

    Why is IPD Important to Consider


    See more from Technical Designs on Controls Consulting

     

    Contact Technical Designs for a presentation on how to reach the next step in IPD evolution.

    Technical Designs invested and developed the tools listed above to meet the Client’s needs. We recognize that in the big picture of sustainability, 80% of the overall cost of a building is in operation and maintenance and 20% is the initial cost. Competitive forces in the market place and Contractors have focus on reducing the initial cost and many times sacrificing building elements and features that dramatically affect the overall operation and maintenance cost. As Building Energy Assessment Professionals, we help Clients avoid fractional percentage decisions that lead to double digit percentage impacts. 

    Services

    Technical Designs Commissions the Reno FAA Control Tower
    Executive Link
    "The Federal Aviation Administration deals with many vendors and Technical Designs stood out due to their performance on this project. They were an asset to the successful completion of this project. I would not hesitate to call upon their services again for future projects."
    ERIC STERN, FAA Reno Technical Operations Manager


    Copyright 2013

    BIM

    Benefits of 3D Design

  • More Owner involvement for design and construction decisions
  • More coordination between the building and trades up front leads to a reduction of change orders and additional claims
  • Fewer project delays during the costly construction phase
  • Minimized impact from design changes
  • Value-added construction quality
  • Complete and useful documentation
  • ×

    BIM

    The Untapped Potential

    Once we have designed the project in 3D we can create sections and 3D views anywhere within the project to detail or coordinate critical areas. Even if we work with a design team that is still limited to 2D drawings, we bring as much of their information into our 3D model as possible and continue the design process. This is mandated as an internal coordination step to improve a product quality delivery.

    ×

    IPD Important

    Integrated Project Delivery

    Tools to integrate building controls, automation, and commissioning - As MEP engineers, we found ourselves spending a great deal of time engineering building systems and trying to translate our ideas on how best to control these systems to allow our Clients the best comfort and energy efficiency possible. Drawing on the BIM canvas of information and using IPD tools, Technical Designs developed in house structures to bring together more points of information and value to the Owner.

    ×

    Cx Summary

    What Cx is and isn't

    Commissioning will provide an Owner with the following

  • Accept an optimized building
  • Minimized warranty issues
  • Minimized energy costs
  • O&M costs Minimized
  • Maximized functionality
  • Report on construction process
  • NOT: Testing, adjusting and balancing (TAB)
  • NOT: Contractor’s startup
  • NOT: Engineer’s installation “observation”
  • NOT: Performance verification alone
  • NOT: Limited to HVAC systems or Controls systems
  • NOT: Routinely included in Professional Design Consultant’s fees
  • NOT: MEP coordination (may assist)
  • DOES NOT: Have responsibility to direct or make corrections to identified deficiencies
  • ×

    Read More

    Building and Asset Management

    ×

    Search

    Technical Designs

    Search Technical Designs for things you want to find...

    Sample Search Terms: BIM LEED Commissioning BEAP ASHRAE Lynxspring Niagara Boyd FAA Hampton AACT Silverland
    ×